ADU additions and remodels in Encinitas
Encinitas makes it simple to bundle an ADU with work on the main house: one set of plans, two permit records. That shares design and engineering. It also means each part keeps its own rules and fees. Here's how it works under the City of Encinitas ADU page and EMC 30.48.040.

How the city processes combined work
- Submit one plan set under the primary scope, for example "Residential Addition," and describe the ADU in the project description.
- The building technicians create an additional permit record for the ADU.
- Each record is reviewed; ADU plan review and inspection fees are waived, the house work is not.
- Inspections are scheduled on each individual permit.
Three ways to combine
| Project | Rule |
|---|---|
| Addition that becomes an attached ADU | Up to 1,200 sq ft or the house's living area, whichever is less; 800 sq ft allowed regardless |
| Remodel that carves out a JADU | Up to 500 sq ft within the house's walls; efficiency kitchen; owner occupancy covenant |
| Remodel plus a new detached ADU | Detached ADU rules; one plan set, separate records |
Things that change when you combine
- Energy. Attached ADUs and additions with a permit value of $50,000 or more add one Table 150.2-E measure; new detached ADUs need higher performance and solar. The CAP Checklist sheet applies to every single-family and ADU project. See energy requirements.
- Coastal Zone. An addition increases habitable area, so a CDP applies to the ADU portion; the house work may have its own coastal review.
- Parking. The city guide notes that if living area is added and then converted to a JADU, the house may need additional parking over 2,500 sq ft for new construction, though not for additions or remodels under Gov. Code §65863.3. Confirm with Planning.
- New house. If the ADU is filed with a brand-new house, the city may wait to act on the ADU until the house application is decided.
ADU, addition or guest house?
A guest house in Encinitas needs a lot of at least 10,000 sq ft, is limited to 640 sq ft at main building setbacks, can't have kitchen or laundry facilities, and can only be occupied 30 consecutive days or less, never rented. If you want a kitchen or a tenant, it's an ADU or JADU.
Step by step for combined work
- Submit under the primary scope (for example, Residential Addition) with the ADU in the project description.
- Technicians create a separate ADU permit record.
- Plan for the coastal permit: additions to the house can need one too.
- Energy: additions of $50,000 or more permit value add one efficiency measure (Ord. 2024-04).
- Schedule inspections on each permit separately.
Checklist
- Who lives where during construction?
- Is the ADU or the addition the priority?
- Will one combined set save design time?
- Do the additions push the house over 2,500 sq ft (JADU parking note in the city guide)?
Sources, checked Oct 14, 2026: City of Encinitas ADU page · EMC 30.48.040 · City ADU and JADU Guide (Jan. 2026).
Questions we hear
Can I permit an ADU and a home remodel together in Encinitas?
Yes. The city says combined work can be submitted with one set of plans under the primary scope, such as Residential Addition, with the ADU in the project description. The city creates a separate permit record for the ADU.
Does the waived ADU fee apply to the remodel?
The city waives plan review and inspection fees for ADUs. The remodel or addition to the main house is a separate permit record with its own fees.
Do I schedule inspections separately?
Yes. The city says inspections must be scheduled on the individual permits for bundled projects.
Should I add on or build an ADU in Encinitas?
An ADU adds a rentable unit, with plan review fees waived; an addition expands your house under normal fees. Combined, they're filed together on one plan set.