ADUs on multifamily lots in Encinitas
For owners of duplexes and apartment buildings, EMC 30.48.040 subsection T.19 sets out two ways to add units: converting unused space inside the building, and adding up to two detached ADUs.
Converting space in the building
ADUs are permitted in portions of an existing multifamily structure not currently used as livable space, including storage rooms, boiler rooms, passageways, attics, basements, crawlspaces and garages, if each unit meets state building standards for dwellings. The number allowed is up to 25% of the existing units or one, whichever is greater, with fractions rounded down.
| Existing units | Converted ADUs |
|---|---|
| 2 to 7 | 1 |
| 8 to 11 | 2 |
| 12 to 15 | 3 |
| 16 | 4 |
Worked examples of the 25% rule.
Detached ADUs
No more than two detached ADUs may be built on a lot with an existing multifamily dwelling. They're limited to 16 feet with 4-foot interior side and rear setbacks, or may build to the zone's height limit if they meet the zone's setbacks.
What else applies
- No JADUs in multifamily units.
- Accessibility requirements apply to projects with 3 or more units, per the city's Building topics.
- Coastal Zone: new or converted non-habitable space triggers a Coastal Development Permit.
- Garages: new garages on multifamily lots could be subject to design review (EMC 23.08), per the city guide.
- Covenant: ADUs can't be sold separately from the multifamily ownership structure; rentals over 30 days.
- Utilities: proportional fees for new units; conversions within existing space are exempt under the conditions in T.20.
Step by step
- Consult staff (optional, recommended): Planning, Land Development Engineering, Building, Fire Prevention, and your water district.
- Assemble the submittal: project plans, grading plan if applicable, Stormwater Intake Form, Housing Development Tracking Form, grant deed, preliminary title report (6 months or newer), and a geotechnical report for new construction or additions of 500 sq ft or more.
- Submit in the CSS portal. Technicians check completeness and email the water, sewer and school fee forms.
- Review by Building, Planning, Fire Prevention and Engineering, about 15 working days per round.
- Coastal Development Permit if in the Coastal Zone: reduced plan set, posted notice sign and certificate, postage fee and mailed notice, Notice of Decision, notarized indemnification, and the Coastal Commission appeal window where it applies.
- Covenant: sign, notarize and return the ADU covenant; pay County Recorder fees in CSS.
- Issuance once all divisions approve and agency forms, contractor or owner-builder form, waste management plan and SDG&E work order are in.
- Inspections scheduled in CSS; requests by 3 p.m. are done the next business day. Height certification before roof nailing if Planning requires it.
Checklist
- Count existing units
- Identify non-livable spaces
- Accessibility for 3+ units
- Coastal Zone
- Design review for new garages
- Utility fees
Sources, checked Oct 14, 2026: EMC 30.48.040 · City of Encinitas ADU page · City ADU and JADU Guide (Jan. 2026).
Questions we hear
How many ADUs can I add to an Encinitas apartment building?
Conversions of non-livable space can add ADUs equal to 25% of the existing units, or one, whichever is greater. Up to two detached ADUs may also be built on a lot with an existing multifamily dwelling.
How tall can detached ADUs on a multifamily lot be?
16 feet with 4-foot interior side and rear setbacks, or the zone's height limit if they meet the zone's setbacks.
Can I add a JADU to an apartment?
No. The city says JADUs aren't permitted within multifamily dwelling units.