Encinitas ADU energy requirements
California's building code sets energy rules for every new home. Encinitas adds its own on top, which are known as reach codes. The current set is Ordinance 2024-04, adopted in June 2024. For an ADU, how much it asks of you depends mostly on whether the unit is detached or attached.

At a glance
| Project | What the local code requires |
|---|---|
| New detached ADU | Higher energy performance than the state minimum, plus solar photovoltaic panels |
| Attached ADU, addition or remodel with a permit value of $50,000 or more | One energy efficiency measure of your choice from Table 150.2-E |
| Existing building where more than 50% of the roof framing and exterior bearing walls come out, or conditioned area more than doubles | Treated like new construction |
| Every single-family or ADU project | The Single-Family CAP Checklist, included as a sheet in the plan set |
Source: City of Encinitas, Green Building and Energy Codes. Checked Oct 14, 2026.
Detached ADUs: plan for solar from the start
For a new detached ADU, solar is a design input, not an add-on. Roof shape, pitch and orientation, nearby trees, and where the electrical panel sits all affect how easy it is to meet the requirement. If you're looking at one of the city's preapproved ADU plans, check how its roof faces on your particular lot before you choose it.
Attached ADUs and additions
An attached ADU, or an addition with a permit value of $50,000 or more, needs one efficiency measure picked from Table 150.2-E of the state Energy Code. You choose which one, so it's worth deciding early which measure works best with the rest of your design.
The CAP Checklist
CAP stands for the city's Climate Action Plan. Every single-family and ADU project fills out the Single-Family CAP Checklist and includes it as a sheet in the plans. The city has published a video series that walks through the checklist.
Which code cycle applies
As of mid-October 2026, the city's page still says the 2022 state code is in effect with the 2025 code "taking effect January 1, 2026." The 2025 California Building Standards Code is now in force. Ask the Building division (building@encinitasca.gov, 760-633-2730) whether the local amendments have been readopted for the new cycle, and which version your plan check will use.
Rebates
The city points homeowners to The Switch is On, which lists electrification rebates by ZIP code. Builders of new all-electric homes may also qualify for the California Electric Homes Program. Eligibility and amounts change, so check both before you count on them.
Energy requirements by project
| Project | Ord. 2024-04 (as the city summarizes it) |
|---|---|
| New detached ADU | Higher energy performance and solar PV |
| Attached ADU or addition, permit value $50,000 or more | One efficiency measure (Table 150.2-E) |
| All single-family and ADU projects | Single-Family CAP Checklist sheet in the plans |
Source: City Green Building and Energy Codes page.
Step by step
- Identify the project type and permit value.
- Plan roof area and orientation for PV on a detached unit.
- Pick the efficiency measure for an attached ADU or addition if triggered.
- Add the CAP Checklist sheet to the plan set.
- Building reviews solar requirements with the permit.
Checklist
- Roof space free of shading for PV
- Electrical panel capacity
- Energy compliance documents
- CAP Checklist sheet
- Coordination with SDG&E
Sources, checked Oct 14, 2026: Green Building and Energy Codes · City ADU page. For the permit steps see Encinitas ADU rules and permits.
Questions we hear
Does an ADU need solar in Encinitas?
New detached ADUs must install solar PV under the city's local energy code (Ord. 2024-04), as summarized on the city's Green Building page.