Parking used to be one of the biggest obstacles to an ADU. State law has loosened it a lot, and EV charging has become the new question. Here's what's required, what's optional, and how to lay out the site so both the house and the unit can plug in later.
Published Nov 13, 2026
On a lot of Encinitas streets, parking is the thing neighbors notice first. Narrow roads near the coast, alleys behind older cottages, driveways that already hold two cars and a surfboard trailer. When an ADU goes in, owners wonder where another car fits, and more and more, whether that car will need to charge.
The rules on both have changed in the last few years. Parking requirements for ADUs are lighter than most people expect. EV charging has its own building code rules, and for ADUs they include an exception worth understanding. This post sorts out what the code asks for, then walks through the layout choices that give you flexibility later.
Parking: lighter than you'd think
State ADU law sets a ceiling on what a city can require. According to the HCD ADU Handbook, a city can require at most one parking space per ADU. In a long list of situations, it can't require any.
When no space can be required
The handbook lists cases where no parking can be required for an ADU, including:
- The lot is within one-half mile walking distance of public transit.
- The lot is in an architecturally and historically significant historic district.
- The ADU is part of the existing house or an existing accessory structure.
- On-street parking permits are required but not offered to the ADU occupant.
- There's a car share vehicle within one block.
Whether your lot qualifies, especially on the transit question, depends on where it sits. Check that early, because it can open up design options.
When parking is removed
Two related rules matter a lot in Encinitas, where many ADUs replace a garage or take over part of a driveway. When a garage, carport or covered space is converted or torn down to build an ADU, the replacement parking for the main house doesn't have to be provided. And since a 2024 change, uncovered off-street spaces removed in connection with the ADU don't have to be replaced either. Our ADU parking page explains how these rules apply in Encinitas.
EV charging: what CALGreen says
EV readiness comes from CALGreen, the state's green building code. The 2025 edition took effect January 1, 2026, and HCD publishes a summary of its residential mandatory measures.
The general rule for new homes
For new one- and two-family homes and townhouses with attached private garages, CALGreen calls for EV-capable infrastructure: a listed raceway, trade size 1, for a dedicated 208/240-volt branch circuit, running from the main service or a subpanel to a spot near where a charger would go. The panel also has to have capacity and reserved space for a 40-amp, 208/240-volt dedicated circuit.
The ADU exception
The summary lists an exception for ADUs and junior ADUs built without additional parking facilities. In plain terms: if your ADU doesn't come with its own new parking, the new-construction EV-readiness requirement generally doesn't attach to it. If the project does add parking facilities, expect the EV question to come back.
Code editions and local amendments can shift these details. Confirm the current requirement for your project with the City's building staff during plan check.
Optional doesn't mean irrelevant
Even when the code doesn't require EV readiness, many owners want it. A tenant may drive electric. You may replace your own car. Running conduit while the trench is open costs far less effort than digging again later. That's a design choice, not a requirement, and it's worth making deliberately.
Laying out the site
Here's how we'd think through the layout on a typical Encinitas lot.
Pick where a car would actually park
Start with the real spot, not a theoretical one. A driveway apron, a pad off the alley, the space beside the garage. A charger needs to be within cable reach of where the car's charging port ends up, so this decision drives everything else.
Lots with an alley
Older parts of town often have alley access behind the lot. An alley pad can be the most natural place for the ADU's parking and its charger, since it keeps the front driveway for the house. It also changes where trenches run, and alley-side work can involve right-of-way questions. Ask early whether anything you plan sits outside your property line.
Trace the path back to power
From that spot, trace a route to the main panel or to the ADU's subpanel. If a feeder trench to the ADU is already planned, a second conduit in the same trench is the efficient move. Mark the route on the site plan so it doesn't collide with drainage, irrigation or a future patio.
Decide which panel serves the charger
A charger on the ADU's subpanel puts that load on the unit's side. A charger on the main panel keeps it with the house. Either works, but it affects your load calculation and, if the unit has its own meter, who pays for the charging.
Check the panel's room
An EV circuit is a big, continuous load. The California Energy Commission's ADU guidance also adds battery-ready wiring for newly constructed ADUs with service over 125 amps, and electric-ready circuits when gas appliances go into a new detached unit. All of that competes for space and capacity. Put the EV circuit in the load calculation from the start, even if you only install conduit for now.
Converted garages and charging
Garage conversions are common here, and they're where parking and charging collide. Converting the garage removes covered parking, which state law says doesn't need replacing. But the house may have had its only charger in that garage. If so, plan a new charging location for the main house as part of the conversion. Our garage conversion page covers the design side.
Small units, small panels
Studios and one-bedroom ADUs often get a modest subpanel. Adding a future EV circuit can push you to a larger one. That's a reasonable trade for flexibility, and it's easier to decide on paper than after the drywall is up. If space inside the unit is tight, our note on small kitchens that work shows how much layout matters in a small footprint, and the panel location is part of that.
Bringing it together
Write these down before design is final:
- Whether your lot is exempt from ADU parking, and why.
- Whether any parking is removed, and that it doesn't need replacing.
- Whether the ADU adds new parking facilities, which can bring EV rules into play.
- The charging spot, the conduit route and which panel serves it.
- The EV load included in the electrical calculation.
Our ADU utilities page and energy requirements page cover the rest of the electrical picture. If you're considering running the project yourself, read our note on owner-builder risks first. We work with verified contractors who plan these details on Encinitas lots of every shape. For help with your layout, request a Free Quote consultation.
Sources (accessed Nov 13, 2026): 2025 CALGreen Residential Mandatory Measures Summary (HCD SHL 625) (California Department of Housing and Community Development) · Accessory Dwelling Unit Handbook (California Department of Housing and Community Development) · Energy Code Support Center: 2025 ADU FAQs (California Energy Commission)